Edmonton, Alberta

Roof Replacement in Edmonton — New Roof and Reroofing

Full tear-off and rebuild, handled as an insurance claim from the first inspection to the released depreciation cheque.

Free inspection

Book a free roof replacement assessment

A replacement is the right call when repair stops being economic: when hail has bruised enough of the field that patching means chasing failures every spring, when the shingles are brittle enough that walking the roof creates new damage, or when the insurer has approved the slopes and there is no reason to put a new patch on an old system.

In Edmonton the decision is usually made by an adjuster’s test squares rather than by how the roof looks. If the strike count on a slope exceeds the insurer’s threshold, that slope is replaced. Our job is to make sure every slope that qualifies is counted, and that the scope includes the parts of a roof system people forget are part of the roof.

No-obligation assessment

Free inspection and written report

Photo-documented, dated, and formatted for an insurance claim.

We call back the same business day. We never ask for payment before the insurer has confirmed scope, and we never offer to cover your deductible.

The decision

When replacement beats another repair

A repair is the right answer far more often than a salesperson will tell you. It stops being the right answer at a fairly clear point, and these are the markers:

  • The shingles crack instead of bending. If lifting a tab to fix one thing breaks three others, every repair creates the next repair.
  • The failures have stopped being local. One leak at a pipe boot is a repair; leaks in three unrelated places in one season is a system at the end of its life.
  • Bruising is spread across the field, not concentrated on one slope. Test squares settle this, and so does the adjuster's threshold.
  • The product is discontinued. A visible slope patched in a colour that does not match is a compromise you will look at every day - and Alberta insurers routinely approve full-slope replacement when no reasonable match exists.
  • The tear-off is happening anyway. If decking has to come up, the labour to open the roof is already spent.

If none of those apply, spend the money on the repair instead. Every kind of repair, and the same test worked through in more detail, is on roof repair in Edmonton; the specific jobs are roof leak repair, shingle repair and replacement and decking repair. Which materials actually survive Alberta hail is covered in roofing materials for Alberta hail, and if you are weighing steel against asphalt, metal roofing in Edmonton sets out the profiles, the snow question and the cosmetic damage clause.

Scope

What the work includes

  • Tear-off to the deck. Every layer removed, not shingled over. A second layer hides decking problems, voids most manufacturer warranties, and adds load the trusses were not designed for.
  • Deck inspection and repair. With the old roof off we can finally see the sheathing. Delaminated, rotted or water-stained sheets are replaced. This is priced per sheet and is the most common legitimate supplement on an Edmonton claim.
  • Ice-and-water membrane. Self-adhering membrane at the eaves, in the valleys and around penetrations. In this climate this is the layer that actually stops ice-dam water backing up under the shingles.
  • Synthetic underlayment. Over the remaining field. Lighter, stronger and far more tear-resistant than felt, which matters when a build gets caught by prairie wind.
  • Starter strip, drip edge and flashing. New drip edge at eaves and rakes, new step flashing at walls, new pipe boots and vent hoods. Reusing old flashing is where most post-replacement leaks come from - see flashing repair.
  • A decision on any skylight. An aged skylight under a new roof is the one job everybody regrets postponing, because doing it later means cutting into a new roof. Repair or replace it while the slope is open.
  • Shingles and ridge cap. Architectural asphalt as standard, impact-rated where you want it. Ridge cap is a separate product and a separate line item; a roof finished with cut-up field shingles is a corner being cut.
  • Ventilation check. Intake at the soffit and exhaust at the ridge, balanced, to the 1:300 guidance set out on attic ventilation. Most Edmonton ice damming is a ventilation problem wearing a roofing costume.
  • Clean-up and magnet sweep. Debris hauled, disposal included in the scope, and the yard and driveway swept with a rolling magnet for nails.

Signs

When you need this

Any one of these is worth an inspection. Several together usually means a claim.

  • Granule loss heavy enough that the gutters are full of grit after every rain
  • Shingles that crack rather than flex when lifted
  • Bruised, soft spots you can feel through the shingle with a thumb
  • Multiple leaks in different places rather than one repeatable spot
  • Daylight visible through the roof deck from inside the attic
  • An adjuster who has already approved two or more slopes

Insurance

How this looks as a claim

A replacement is where the ACV-versus-RCV distinction hits hardest, because the numbers are large. On an RCV policy the insurer holds back the depreciation and releases it after the work is invoiced — often the bigger half of the payment. On an ACV policy there is no second cheque and the gap can run five figures.

We prepare the scope in the format your insurer prices from, attend the adjuster meeting, and submit a supplement when items are missing. On a full replacement the items most commonly left off an Edmonton estimate are decking sheets, code-required ice-and-water membrane, drip edge, steep-pitch labour, and disposal of a hidden second layer.

How Edmonton roof claims work

A clear path forward

From storm to finished roof

  1. 1

    Call or send the form

    Same business day

    Tell us what happened and when. Date of loss matters more than people expect.

  2. 2

    Free inspection and report

    Date agreed on that first call

    We walk the roof, photograph every slope, and hand you a written damage report.

  3. 3

    You open the claim

    Day 1 to 3

    You make the call to your insurer. We give you the report, the peril, and the wording.

  4. 4

    Adjuster meeting

    Usually 3 to 14 days

    We meet them on site and walk the damage together, so nothing is missed or minimised.

  5. 5

    Build and sign-off

    1 to 3 days on a typical house

    Tear-off, deck check, ice-and-water membrane, new system, clean-up, final photos.

Timing

How long it takes

Typical Edmonton ranges, what drives them and a cost calculator are set out in roof replacement cost in Edmonton. We put your number in writing after the inspection, and we do not quote a decking figure before tear-off because nobody can see through a roof.

A straightforward Edmonton bungalow with a single-layer asphalt roof and no decking surprises is usually a one-day tear-off and rebuild. A two-storey house with multiple valleys, dormers and a steep pitch runs two to three days. Decking replacement adds time only if a large area is affected.

Weather governs everything. We do not tear off ahead of a forecast we do not like, and in winter we work to the shingle manufacturer’s cold-weather instructions rather than against them — asphalt shingles need to seal, and a roof installed badly in February announces itself the following spring.

Where the work is covered by insurance, the number that matters is the insurer’s approved scope plus your deductible, not the sticker price. We prepare the scope, submit supplements for anything missing, and you see every line.

Straight answers

Roof Replacement: common questions

Can you just shingle over the old roof?

We will not. It hides decking damage, voids most manufacturer warranties, adds weight, and traps heat so the new shingles age faster. It is also the first thing a future adjuster or home inspector will find. If a quote is unusually cheap, check whether it includes tear-off and disposal.

How long does a new roof last in Edmonton?

Less than the number on the package, because the number on the package assumes a gentler climate. Architectural asphalt rated for 30 years commonly gives 18 to 25 here, depending on exposure, ventilation, and how many hail events it lives through. Good attic ventilation buys more years than an expensive shingle does.

Do I need impact-rated shingles?

In a hail corridor they are worth considering, particularly if you are paying out of pocket or you have had two claims already. Class 4 impact-rated products cost more up front and some insurers offer a premium credit for them — ask your broker whether yours does before you decide.

Will you work in winter?

Yes, with conditions. Emergency work happens in any weather. Full replacements are scheduled around temperature and wind because shingles need to seal properly. We will tell you plainly if waiting for spring produces a better roof.

Where we work

Where we do this work

Edmonton proper and the Capital Region. Summer hail, prairie wind, ice dams and freeze–thaw cycles attack different parts of a roof, and our inspections look past the obvious impact marks to flashing, vents, underlayment and decking.

If your roof is inside the Anthony Henday, we are usually there the next morning.

Worried about what the last storm did?

Roof damaged? Start with the report, not the quote.

A free, photo-documented inspection is what turns a phone call to your insurer into a paid claim. It costs you nothing and takes about an hour.

Updated · How we check what is on this page

Call (780) 555-0142Free inspection